Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha is a proposed mining project in Kurauna, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Ravi Kumar Tak.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Nov 2024), as of 27 Nov 2026.
Where is it?
In Kurauna, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹6.8 crore and a site of 50 acres.
When was it filed?
The application was filed on 11 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata…
Project details
| Official title | Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No.317 Mi, Khand No. 03, Area 20.242 ha in Village- Kurauna, Tehsil- Orai, District- Jalaun, Uttar Pradesh of Coral Associates Partner Shri Ravi Kumar Tak |
|---|---|
| Status | Cleared for impact study |
| Status since | 9 Nov 2024 |
| Application filed | 11 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ravi Kumar Tak |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹6.8 crore |
| Village / locality | Kurauna |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02398 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Apr 2025 | Environmental approval granted | 50 acres | ₹6.8 crore |
| Early planning filed 11 Sept 2024 (this page) | Cleared for impact study | 50 acres | ₹6.8 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 140.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Kurauna, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 0 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — more information requested, 0 m away
- Sand/Morrum Mining" on the riverbed of Betwa River — environmental approval granted, 350 m away
- Sand/Morrum Mining" on the riverbed of Betwa River — cleared for impact study, 350 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 500 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 500 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — more information requested, 550 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.