Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Mar 2025 |
| Application filed | 19 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suneet Kumar |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Berkhera |
| Taluk / tehsil | Mohammdi |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01691 |
In context
56 applications in Kheri since January 2022 are in the same category (Mining): 37 approved, 15 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.7 acres, this one is larger than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Berkhera, Mohammdi, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — lapsed, 800 m away
- CGD Network GA-11A.01 — forest land use approved, 6.4 km away
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — forest land use approved, 10.7 km away
- Siyaraha Soil Mining Project — under environmental review, 13.1 km away
- Proposed 300 KLPD (2x150 KLPD) Grain/Molasses/Cane juice based distillery, 15… — cleared for impact study, 18.3 km away
- Sahora Soil Mining Project — environmental approval granted, 21.1 km away
- "Ordinary Earth Mine", Village-Barhaiya Khera, Gata No.-71, 35, 66, 67, 65,… — lapsed, 22.1 km away
- Dhakora Soil Mining Project — environmental approval granted, 22.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.