One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No. 2, Area-…
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Mar 2025 |
| Application filed | 12 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arvind Singh |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Gangbarar Tari |
| Taluk / tehsil | Zamania |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01696 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Jan 2024 (this page) | Lapsed | 27.2 acres | ₹70 lakh |
| Early planning filed 21 Mar 2023 | Cleared for impact study | 27.2 acres | ₹70 lakh |
In context
9 applications in Ghazipur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gangbarar Tari, Zamania, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — cleared for impact study, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 2.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 5.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 5.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — lapsed, 9.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 11.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 15.7 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — forest land use approved, 15.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.