Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Kathaut, Tehsil:- Muhammadabad, District:- Ghazipur. |
|---|---|
| Status | Forest land use approved |
| Status since | 3 Jul 2025 |
| Application filed | 22 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 3,420 m² |
| Project cost | ₹60 lakh |
| Village / locality | Kathut |
| Taluk / tehsil | Mohammadabad |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06679 |
In context
7 applications in Ghazipur since January 2022 are in the same category (Fuel stations): 4 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathut, Mohammadabad, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — lapsed, 2.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 7.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 10.6 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — lapsed, 11.3 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — cleared for impact study, 11.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 15.8 km away
- "Ordinary Sand Mining" from Riverbed of Ganga River — environmental approval granted, 20.5 km away
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.