Quick answers
What is this project?
Project: Ganeshpur Gang Sand Mining Project on Ganga Riverbed Village- Ganeshpur Gang, Tehsil- Atrauli, District: Aligarh, Uttar Pradesh is a lapsed mining project in Ganeshpur Gang, Atrauli, Aligarh, Uttar Pradesh. The site covers 39.5 acres.
Who is building it?
The applicant is Kavindra Rastogi.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Ganeshpur Gang, Atrauli, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.2 crore and a site of 39.5 acres.
When was it filed?
The application was filed on 27 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Project: Ganeshpur Gang Sand Mining Project on Ganga Riverbed Village- Ganeshpur Gang,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 27 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kavindra Rastogi |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹4.2 crore |
| Village / locality | Ganeshpur Gang |
| Taluk / tehsil | Atrauli |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01706 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jan 2024 (this page) | Lapsed | 39.5 acres | ₹4.2 crore |
| Early planning filed 3 May 2023 | Cleared for impact study | 39.5 acres | ₹4.2 crore |
In context
No other mining lease on record has applied within 5 km of this site.
Where it is
Ganeshpur Gang, Atrauli, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project: Ganeshpur Gang Sand Mining Project on Ganga Riverbed Village-… — cleared for impact study, 0 m away
- Diversion of protected forest land for Construction of approach road to the… — more information requested, 15 km away
- Diversion of protected forest land for Four-lane widening and strengthening… — forest land use approved, 18.7 km away
- Diversion of 0.2204 Hec. Protected Forest Land Proposed to Be Diverted for… — more information requested, 23.9 km away
- Industrial project by Wave Distilleries & Breweries Ltd. — returned to applicant, 31.8 km away
- Industrial project by Wave Distilleries & Breweries Ltd. — cleared for impact study, 31.8 km away
- Wave Distilleries and Breweries Ltd Grain Unit — initial checks, 31.9 km away
- Industrial project by Wave Distilleries and Breweries Limited — environmental approval granted, 31.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.