Quick answers
What is this project?
Diversion of protected forest land for Construction of approach road to the retail outlet of HPCL-Mittal Energy Limited located on Aligarh-Ramghat Road (Kalyan Singh Marg) (MDR-105) km stone no. 38 (Chainage-37.949, R.H.S) at Khasra No. 501, Village- Malahpur, Tehsil- Atrauli, District- Aligarh (Uttar Pradesh) is a proposed fuel station in Malehpur, Atrauli, Aligarh, Uttar Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Malehpur, Atrauli, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 1.3 acres and 3,660 m² of forest land.
When was it filed?
The application was filed on 31 Mar 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Jun 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 3,660 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Malehpur |
| Taluk / tehsil | Atrauli |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05418 |
In context
25 applications in Aligarh since January 2022 are in the same category (Fuel stations): 14 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.3 acres, this one is larger than 80% of them.
Where it is
Malehpur, Atrauli, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of protected forest land for Four-lane widening and strengthening… — forest land use approved, 5.7 km away
- Diversion of 0.2204 Hec. Protected Forest Land Proposed to Be Diverted for… — more information requested, 12.6 km away
- Project: Ganeshpur Gang Sand Mining Project on Ganga Riverbed Village-… — lapsed, 15 km away
- Project: Ganeshpur Gang Sand Mining Project on Ganga Riverbed Village-… — cleared for impact study, 15 km away
- Industrial project by Wave Distilleries & Breweries Ltd. — returned to applicant, 21.2 km away
- Industrial project by Wave Distilleries & Breweries Ltd. — cleared for impact study, 21.2 km away
- Wave Distilleries and Breweries Ltd Grain Unit — initial checks, 21.2 km away
- Industrial project by Wave Distilleries and Breweries Limited — environmental approval granted, 21.2 km away
6 Hindustan Petroleum Corporation (HPCL) projects in Aligarh
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.