Quick answers
What is this project?
Common Bio-Medical Waste Treatment Facility at Khasra No. 256, Vill.-Dholaheri, Post - Chilkana, Chilkana Gandewar Road, Distt. – Saharanpur, Uttar Pradesh is a lapsed waste management project in Dhaulaheri, Saharanpur, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Nature Clean Bio-Medical Waste Management.
Has it been approved?
No. The application was lapsed on 5 Dec 2024, so it is no longer under consideration.
Where is it?
In Dhaulaheri, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.3 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 26 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Dec 2024 |
| Application filed | 26 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | Nature Clean Bio-Medical Waste Management |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Dhaulaheri |
| Taluk / tehsil | Saharanpur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01713 |
Where it is
Dhaulaheri, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended BharatNet Program (ABP) — lapsed, 9.7 km away
- Proposed "Sand/ Bajri/ Boulder(RBM) Excavation Project" at Gata No. – 1/1 /1,… — environmental approval granted, 9.8 km away
- Proposed "Sand/ Bajri/ Boulder(RBM) Excavation Project" at Gata No. – 1/1 /1,… — cleared for impact study, 9.8 km away
- "Proposed Construction of Residential & Non- Residential Buildings for 05th… — initial checks, 10 km away
- Proposed 11 KV Electric Line (Underground Line 1207 Meter and Overhead Line… — forest land use approved, 10.2 km away
- Diversion of 0.16 Ha Forest Land for "Construction of Entry / Exit approach to… — forest land use approved, 10.3 km away
- Diversion of Forest Land for Replacement of existing 11KV overhead lines with… — forest land use approved, 10.3 km away
- Sand/Morrum/Bajri Excavation Project — cleared for impact study, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.