Quick answers
What is this project?
Diversion of 0.16 Ha Forest Land for "Construction of Entry / Exit approach to IOCL Retail MH/HSD Retail Outlet on Gagalheri-Saharanpur-Sarsawa Road (ODR) KM-24 (CH.23.300), RHS at Khasra No.- 87, Village- Govindpur, Tehsil-Nakur & District- Saharanpur (Uttar Pradesh)" is an approved fuel station in Gobindpur, Saharanpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Poonam.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Gobindpur, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.8 acres and 1,600 m² of forest land.
When was it filed?
The application was filed on 17 Feb 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Dec 2025 |
| Application filed | 17 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Poonam |
| Land area | 3,200 m² |
| Forest land | 1,600 m² |
| Project cost | ₹50 lakh |
| Village / locality | Gobindpur |
| Taluk / tehsil | Saharanpur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06824 |
In context
16 applications in Saharanpur since January 2022 are in the same category (Fuel stations): 12 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.8 acres, this one is smaller than 56% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gobindpur, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Replacement of existing 11KV overhead lines with… — forest land use approved, 800 m away
- Diversion of 0.145 Ha Forest land for "Construction of Entry/Exist Approach to… — forest land use approved, 2.8 km away
- Sarsawa Airport (Integration of Terminal Building and allied facilities in… — environmental approval granted, 3 km away
- Proposed 11 KV Electric Line (Underground Line 1207 Meter and Overhead Line… — forest land use approved, 3.5 km away
- Amende BharatNet Project (Sarsawan-Saharanpur) — lapsed, 3.8 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Nayara… — forest land use approved, 4.4 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to IOCL… — forest land use approved, 4.8 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to HPCL… — forest land use approved, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.