What is this project?
Diversion of Forest Land for Replacement of existing 11KV overhead lines with 11KV underground HT cable from TX to ARC Colony at Sarsawa, Saharanpur is an approved power project in Gobindpur, Saharanpur, Uttar Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Central Public Works Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Sept 2026), as of 27 Nov 2026.
Where is it?
In Gobindpur, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.6 acres and 2,610 m² of forest land.
When was it filed?
The application was filed on 2 Mar 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 2 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Central Public Works Department |
| Land area | 2,600 m² |
| Forest land | 2,610 m² |
| Project cost | ₹2 lakh |
| Village / locality | Gobindpur |
| Taluk / tehsil | Saharanpur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06815 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gobindpur, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.16 Ha Forest Land for "Construction of Entry / Exit approach to… — forest land use approved, 800 m away
- Proposed 11 KV Electric Line (Underground Line 1207 Meter and Overhead Line… — forest land use approved, 2.8 km away
- Sarsawa Airport (Integration of Terminal Building and allied facilities in… — environmental approval granted, 2.8 km away
- Diversion of 0.145 Ha Forest land for "Construction of Entry/Exist Approach to… — forest land use approved, 3.6 km away
- Amende BharatNet Project (Sarsawan-Saharanpur) — lapsed, 4.6 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Nayara… — forest land use approved, 5.2 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to IOCL… — forest land use approved, 5.6 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to HPCL… — forest land use approved, 8.4 km away
All 26 Central Public Works Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.