Quick answers
What is this project?
Riverbed Sand/Morrum Mining having lease area-18.0 ha (44.47 acre), along River Ken in Gata No-116g, Village-Risaura, Tehsil-Naraini, District- Banda, U. P is a proposed mining project in Risaura, Naraini, Banda, Uttar Pradesh. The site covers 44.5 acres.
Who is building it?
The applicant is Rudra Prakash.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Oct 2024), as of 27 Nov 2026.
Where is it?
In Risaura, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 44.5 acres.
When was it filed?
The application was filed on 8 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/Morrum Mining having lease area-18.0 ha (44.47 acre), along River Ken in…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 8 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rudra Prakash |
| Land area | 44.5 acres (18 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Risaura |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01902 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Nov 2024 | Environmental approval granted | 44.5 acres | ₹75 lakh |
| Early planning filed 8 Aug 2024 (this page) | Cleared for impact study | 44.5 acres | ₹75 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 44.5 acres, this one is larger than 61% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Risaura, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining having lease area-18.0 ha (44.47 acre), along… — environmental approval granted, 0 m away
- Proposed Sand/Morrum Mining Project on Ken River Bed — environmental approval granted, 3.4 km away
- "Gitti/Stone Mining" from Village- Pangara, Gata no.- 314, Khand No.- 03,… — initial checks, 4.2 km away
- "Morrum Mining" at Village- Manpur Khurd, Gata No.- 165, 164, Lease Area-… — more information requested, 4.2 km away
- Environmental clearance of Morrum removal from Bhumidhari/ Agricultural land/… — under environmental review, 4.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh… — environmental approval granted, 4.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s A.K. Singh… — cleared for impact study, 4.5 km away
- Building stone (Gitti/Patthar) mine at Gata No.- 41 and 42 (Khand No.–01)… — under environmental review, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.