Quick answers
What is Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd?
Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd is an approved industrial project in Chandanpur, Hasanpur, Amroha, Uttar Pradesh. The site covers 59.8 acres.
Who is building it?
The applicant is Triveni Engineering and Industries LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Nov 2024), as of 27 Nov 2026.
Where is it?
In Chandanpur, Hasanpur, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.3 crore and a site of 59.8 acres.
When was it filed?
The application was filed on 29 Aug 2024.
Project details
| Official title | Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd Along With Expansion of Existing Co Gen Power Capacity From 10.0 MW to 18.0 MW Within Existing Industry Premises at Village-Chandanpur Khadar, Tehsil: Hasanpur District– Amroha, Uttar Pradesh by M/S Triveni Engineering & Industries LTD, (Unit: Chandanpur, Division: Sugar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Nov 2024 |
| Application filed | 29 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Triveni Engineering and Industries LTD |
| Land area | 59.8 acres (24.2 ha) |
| Project cost | ₹4.3 crore |
| Village / locality | Chandanpur |
| Taluk / tehsil | Hasanpur |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01976 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 29 Aug 2024 (this page) | Environmental approval granted | 59.8 acres | ₹4.3 crore |
| Early planning filed 4 Sept 2023 | Cleared for impact study | 59.8 acres | ₹4.3 crore |
In context
14 applications in Amroha since January 2022 are in the same category (Industry): 7 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 59.8 acres, this one is larger than 86% of them.
Where it is
Chandanpur, Hasanpur, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd — cleared for impact study, 0 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 12.6 km away
- "Soil Excavation Project" at Gata No. 305 (Total area 1.4855 Ha.) — environmental approval granted, 13 km away
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — under forest review, 13 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 15.6 km away
- Proposal Regarding the permission for the non-forestry use of Protected Forest… — initial checks, 20.9 km away
- M/S Nexgen Energia Ltd Noida Protected Land is required to be diverted (FCA… — more information requested, 22.1 km away
- Proposed IOCL Retail Outlet at Zero Point NH-9 to Dayawali Village Road,… — under wildlife review, 22.4 km away
All 14 Triveni Engineering and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.