Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Mubarikpur, Hasanpur, Amroha, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Jun 2025), as of 27 Nov 2026.
Where is it?
In Mubarikpur, Hasanpur, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.5 acres and 700 m² of forest land.
When was it filed?
The application was filed on 31 Oct 2024.
Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:-Muvarikpur kalan, Tehsil:-Hasanpur & District:-Amroha. |
|---|---|
| Status | Forest land use approved |
| Status since | 6 Jun 2025 |
| Application filed | 31 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,900 m² |
| Forest land | 700 m² |
| Project cost | ₹65 lakh |
| Village / locality | Mubarikpur |
| Taluk / tehsil | Hasanpur |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06666 |
In context
30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.5 acres, this one is smaller than 93% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mubarikpur, Hasanpur, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — under forest review, 4.7 km away
- Proposal Regarding the permission for the non-forestry use of Protected Forest… — initial checks, 5.7 km away
- M/S Nexgen Energia Ltd Noida Protected Land is required to be diverted (FCA… — more information requested, 7.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 7.8 km away
- Diversion of Protected Forest Land for Construction of Approach Road to the… — forest land use approved, 8.6 km away
- Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line… — under wildlife review, 12 km away
- Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line… — more information requested, 12 km away
- Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) with… — environmental approval granted, 12.2 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Amroha
- Diversion of 0.0197ha of proposed Protected Forest Land Proposed For Diversion… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — lapsed
- NOC Wildlife Clearance of Protected Forest Land Proposed For Diversion For… — more information requested
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
8 Hindustan Petroleum Corporation (HPCL) projects in Amroha
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.