Quick answers
What is this project?
"Soil Excavation Project" at Gata No. 305 (Total area 1.4855 Ha.) is an approved mining project in Bagarpur Chhoiya, Hasanpur, Amroha, Uttar Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Kadeer Ahamad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 May 2026), as of 27 Nov 2026.
Where is it?
In Bagarpur Chhoiya, Hasanpur, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 3.7 acres.
When was it filed?
The application was filed on 27 Dec 2025.
Project details
| Official title | "Soil Excavation Project" at Gata No. 305 (Total area 1.4855 Ha.) located in Village – Bagadpur Chhoiya, Tehsil - Hasanpur& District - Amroha, Uttar Pradesh,Applicant-Shri Kadeer Ahamad |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 May 2026 |
| Application filed | 27 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kadeer Ahamad |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Bagarpur Chhoiya |
| Taluk / tehsil | Hasanpur |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03257 |
In context
38 applications in Amroha since January 2022 are in the same category (Mining): 27 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.7 acres, this one is smaller than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bagarpur Chhoiya, Hasanpur, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd — environmental approval granted, 13 km away
- Expansion of Existing Sugar Unit From 6000 Tcd to 10,000 Tcd — cleared for impact study, 13 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 16.3 km away
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — under forest review, 18.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 23.3 km away
- Proposal Regarding the permission for the non-forestry use of Protected Forest… — initial checks, 28.9 km away
- M/S Nexgen Energia Ltd Noida Protected Land is required to be diverted (FCA… — more information requested, 30.5 km away
- Diversion of Protected Forest Land for Construction of Approach Road to the… — forest land use approved, 31.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.