Quick answers
What is this project?
Proposed project of Sand/Morrum Mining project at Gata No.- 02, Khand- 01, Area- 3.50 ha, Village- Kalothra Ghat, Tehsil- Tahrauli, District- Jhansi (U.P.) by M/s Monu Enterprises, Prop. Shri Monu Ansari is an approved mining project in Barehta, Moth, Jhansi, Uttar Pradesh. The site covers 8.6 acres.
Who is building it?
The applicant is Monu ansari.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Nov 2026), as of 27 Nov 2026.
Where is it?
In Barehta, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹56 lakh and a site of 8.6 acres.
When was it filed?
The application was filed on 23 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 23 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Monu ansari |
| Land area | 8.6 acres (3.5 ha) |
| Project cost | ₹56 lakh |
| Village / locality | Barehta |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04622 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.6 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Barehta, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 2.6 km away
- Area 1.526 Ha Khanda Boulder Gitti Bailast Mining Project At Araji No.773,… — environmental approval granted, 2.6 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 2.6 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — lapsed, 2.7 km away
- Building Stone (Khanda, Gitti, Boulder, Ballast) Mining Project — environmental approval granted, 2.8 km away
- Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project — withdrawn, 2.8 km away
- River Bed Sand/ Morrum Mining — under environmental review, 2.8 km away
- River Bed Sand/ Morrum Mining — cleared for impact study, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.