What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

"River Bed Sand/ Morrum Mining from Ken River bed "

"River Bed Sand/ Morrum Mining from Ken River bed " is an approved mining project in Sandi, Banda, Uttar Pradesh. The site covers 113.7 acres. Its stated project cost is ₹9.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Feb 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "River Bed Sand/ Morrum Mining from Ken River bed "?

"River Bed Sand/ Morrum Mining from Ken River bed " is an approved mining project in Sandi, Banda, Uttar Pradesh. The site covers 113.7 acres.

Who is building it?

The applicant is Shri Chandra Shekhar Agarwal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Sandi, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹9.4 crore and a site of 113.7 acres.

When was it filed?

The application was filed on 30 Sept 2025.

Project details

StatusEnvironmental approval granted
Status since9 Feb 2026
Application filed30 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShri Chandra Shekhar Agarwal
Land area113.7 acres (46 ha)
Project cost₹9.4 crore
Village / localitySandi
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03641

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Sept 2025 (this page)Environmental approval granted113.7 acres₹9.4 crore
Early planning filed 23 Mar 2024Cleared for impact study113.7 acres₹9.4 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 113.7 acres, this one is larger than 97% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Sandi, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.