Quick answers
What is "Sand/Morrum Mining" from Riverbed of Ken River?
"Sand/Morrum Mining" from Riverbed of Ken River is a lapsed mining project in Durendi, Banda, Uttar Pradesh. The site covers 66.7 acres.
Who is building it?
The applicant is Devendra Bhati.
Has it been approved?
No. The application was lapsed on 12 Feb 2025, so it is no longer under consideration.
Where is it?
In Durendi, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 66.7 acres.
When was it filed?
The application was filed on 9 May 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Ken River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Ken River at Village- Duredi, Gata No.- 4881, 4880,4834, 4824ख, Lease Area- 27.00 ha. (66.71 Acres), Tehsil- Banda, District- Banda, Uttar Pradesh, Project Proponent- M/s Riddhi Siddhi Housing Pvt. Ltd. (Director- Shri Devendra Singh Bhati) |
|---|---|
| Status | Lapsed |
| Status since | 12 Feb 2025 |
| Application filed | 9 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Devendra Bhati |
| Land area | 66.7 acres (27 ha) |
| Project cost | ₹1 crore |
| Village / locality | Durendi |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02064 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Oct 2025 | Environmental approval granted | 66.7 acres | ₹2.5 crore |
| Early planning filed 8 Feb 2025 | Cleared for impact study | 66.7 acres | ₹2.5 crore |
| Early planning filed 9 May 2024 (this page) | Lapsed | 66.7 acres | ₹1 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 66.7 acres, this one is larger than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 133.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Durendi, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 200 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 200 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 1 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — lapsed, 1.2 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — cleared for impact study, 1.2 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty… — environmental approval granted, 1.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty… — cleared for impact study, 1.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Glint… — environmental approval granted, 1.9 km away
More from Devendra Bhati in Banda
- Sand/Morrum Mining at Part of Gata 1141, 1137, 1136, 1123/2,… — environmental approval granted
- Sand/Morrum Mining at Part of Gata 1141, 1137, 1136, 1123/2,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.