Quick answers
What is "Sand/Morrum Mining" from Riverbed of Ken River?
"Sand/Morrum Mining" from Riverbed of Ken River is a proposed mining project in Durendi, Banda, Uttar Pradesh. The site covers 98.8 acres.
Who is building it?
The applicant is Devendra Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Durendi, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10 crore and a site of 98.8 acres.
When was it filed?
The application was filed on 31 Aug 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Ken River at Village- Duredi, Gata No.- 4943, 4942, 4941, 4939GA, 4938, 4937, 4922KA, 4923KA, 4925KA, 4931, 4959GA, 4958, 4957, 4955, 4883, lease area- 40.0 ha., Tehsil- Banda, District- Banda, Uttar Pradesh, Project Proponent- A. D. Agro Foods Pvt. Ltd. (Director- Shri Devendra Bhandari) |
|---|---|
| Status | More information requested |
| Status since | 10 Oct 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Devendra Singh |
| Land area | 98.8 acres (40 ha) |
| Project cost | ₹10 crore |
| Village / locality | Durendi |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04190 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 98.8 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Durendi, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 800 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 800 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 1 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher… — under environmental review, 1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.6 km away
- River Bed Sand/Morrum Mining having lease area 24.0 ha (59.30 acre) along… — under environmental review, 2.1 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — lapsed, 2.2 km away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — cleared for impact study, 2.2 km away
More from Devendra Singh in Banda
- Riverbed Sand Mine from Yamuna River (Private Land), Village- Sadi Madanpur… — environmental approval granted
- Riverbed Sand Mine from Yamuna River (Private Land), Village- Sadi Madanpur… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.