Quick answers
What is this project?
"Ordinary Soil Excavation Mining" Project at Gata No.- 53, Village- Sersa, Tehsil- Hasanganj, District- Unnao, Uttar Pradesh. (Area-1.1709 Ha). M/s MAHAKAL TRADING COMPANY, Prop- Shri Tej Bahadur Singh S/o Shri Onkar Singh is an approved mining project in Sarsa, Hasanganj, Unnao, Uttar Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Tej Bahadur Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Oct 2024), as of 27 Nov 2026.
Where is it?
In Sarsa, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹11 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 23 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2024 |
| Application filed | 23 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tej Bahadur Singh |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹11 lakh |
| Village / locality | Sarsa |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02159 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.9 acres, this one is larger than 62% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sarsa, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project at Gata No. -55 घ, 56, 57, 90क, Village:… — under environmental review, 2.9 km away
- "Ordinary Earth Mining Project" at Gata No.- 276, Village- Baheria Bujurg,… — environmental approval granted, 3.5 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 4.9 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 5.4 km away
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 5.4 km away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 5.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 5.4 km away
- Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 5.6 km away
More from Tej Bahadur Singh in Unnao
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.