Quick answers
What is this project?
"Ordinary Earth Mining Project" at Gata No.- 276, Village- Baheria Bujurg, Tehsil- Hasanganj, District- Unnao of State- Uttar Pradesh over an area of 1.2879 ha., by Anil Kumar is an approved mining project in Baheria Buzurg, Hasanganj, Unnao, Uttar Pradesh. The site covers 3.2 acres.
Who is building it?
The applicant is Anil Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Sept 2026), as of 27 Nov 2026.
Where is it?
In Baheria Buzurg, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 2 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Sept 2026 |
| Application filed | 2 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Anil Kumar |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Baheria Buzurg |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04197 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.2 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Baheria Buzurg, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project at Gata No. -55 घ, 56, 57, 90क, Village:… — under environmental review, 950 m away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 53, Village- Sersa,… — environmental approval granted, 3.5 km away
- Proposed "Ordinary Earth Excavation Project" at Gata No.- 105, 107, 109, 5 — environmental approval granted, 4.2 km away
- "Ordinary Earth Mining Project" — environmental approval granted, 4.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 5.1 km away
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 5.1 km away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 5.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.