Cleared for impact studyMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Yamuna River of S.V. Catering Service. Prop. Smt. Sarita Bhim Saria, located at Gata No. Part of 96/2 (Khand No. 01), Village- Marka Khadar, Tehsil- Baberu, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 20.00 ha.

Proposed riverbed sand/morrum mining project from Yamuna River of S.V. Catering Service. Prop. Smt. Sarita Bhim Saria, located at Gata No. Part of 96/2 (Khand No. 01), Village- Marka Khadar, Tehsil- Baberu, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 20.00 ha is a proposed mining project in Marka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 49.4 acres. Its stated project cost is ₹3.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Aug 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Yamuna River of S.V. Catering Service. Prop. Smt. Sarita Bhim Saria, located at Gata No. Part of 96/2 (Khand No. 01), Village- Marka Khadar, Tehsil- Baberu, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 20.00 ha is a proposed mining project in Marka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 49.4 acres.

Who is building it?

The applicant is Sarita Bhimsaria.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Aug 2023), as of 27 Nov 2026.

Where is it?

In Marka Khadar, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.7 crore and a site of 49.4 acres.

When was it filed?

The application was filed on 14 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Yamuna River of S.V. Catering Service.…

Project details

StatusCleared for impact study
Status since14 Aug 2023
Application filed14 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSarita Bhimsaria
Land area49.4 acres (20 ha)
Project cost₹3.7 crore
Village / localityMarka Khadar
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00433

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Aug 2024Environmental approval granted49.4 acres₹3.7 crore
Early planning filed 14 Aug 2023 (this page)Cleared for impact study49.4 acres₹3.7 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 98.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Marka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.