One of 2 filings for this project. The project's main page, with every filing and where each stands: Naithala Khadar Sand Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Nov 2024 |
| Application filed | 14 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajiv Singh |
| Land area | 30.8 acres (12.5 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Nethla |
| Taluk / tehsil | Baghpat |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02292 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Apr 2025 | Environmental approval granted | 30.8 acres | ₹35 lakh |
| Early planning filed 14 Sept 2024 (this page) | Cleared for impact study | 30.8 acres | ₹35 lakh |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.8 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Nethla, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Naithala Khadar Sand Mining Project — environmental approval granted, 0 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — environmental approval granted, 750 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — cleared for impact study, 750 m away
- Proposed Protected Forest Land To Be Diverted For Entry/Exit To M/S Bagpat… — forest land use approved, 2.1 km away
- Gauripur Jawaharnagar Soil Mining Project — environmental approval granted, 4 km away
- Project Related to Nagar Palika Parisahd Baghpat and Baraut Reorganisation… — more information requested, 4 km away
- Baghu Soil Mining Project — environmental approval granted, 4.8 km away
- Re-diversion of protected forest land for Permission of Laying and… — lapsed, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.