Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Yamuna River at Village-Gauripur Khadar, Gata No.- 3, 4 & 5क, Lease Area- 14.0224 ha. Tehsil– Baghpat District– Baghpat, Uttar Pradesh, Project Proponent- Manish Jaiswal/99092 (Contact Person- Shri Manish Jaiswal) |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2026 |
| Application filed | 14 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manish Jaiswal |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹8.2 crore |
| Village / locality | Gauripur |
| Taluk / tehsil | Baghpat |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03166 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Oct 2025 (this page) | Environmental approval granted | 34.6 acres | ₹8.2 crore |
| Early planning filed 11 Apr 2025 | Cleared for impact study | 34.6 acres | ₹8.2 crore |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is larger than 76% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Gauripur, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Yamuna River — cleared for impact study, 0 m away
- Naithala Khadar Sand Mining Project — environmental approval granted, 750 m away
- Naithala Khadar Sand Mining Project — cleared for impact study, 750 m away
- Proposed Protected Forest Land To Be Diverted For Entry/Exit To M/S Bagpat… — forest land use approved, 1.5 km away
- Gauripur Jawaharnagar Soil Mining Project — environmental approval granted, 3.5 km away
- Project Related to Nagar Palika Parisahd Baghpat and Baraut Reorganisation… — more information requested, 4 km away
- Baghu Soil Mining Project — environmental approval granted, 4.3 km away
- Re-diversion of protected forest land for Permission of Laying and… — lapsed, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.