Quick answers
What is this project?
Certificate of "no Increase in Pollution Load" for Addition of Alternative Feedstock As Grain is a proposed industrial project in Mohra, Dhampur, Bijnor, Uttar Pradesh. The site covers 39.5 acres.
Who is building it?
The applicant is Arun Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mohra, Dhampur, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹351.7 crore and a site of 39.5 acres.
When was it filed?
The application was filed on 19 Nov 2024.
Project details
| Official title | Certificate of "no Increase in Pollution Load" for Addition of Alternative Feedstock As Grain Along With Molasses Without Change in Production Capacity I.E.350 Kld by the Distillery Unit of M/S Dhampur Sugar Mills Limited, Chemical Division |
|---|---|
| Status | Initial checks |
| Status since | 19 Nov 2024 |
| Application filed | 19 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Arun Kumar |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹351.7 crore |
| Village / locality | Mohra |
| Taluk / tehsil | Dhampur |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02297 |
In context
8 applications in Bijnor since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohra, Dhampur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — environmental approval granted, 500 m away
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — cleared for impact study, 500 m away
- Diversion of Forest Land for Construction of New Road — lapsed, 1.2 km away
- Diversion of Forest Land for the Work of 4 Lane Widening and Strengthening of… — in-principle approval, conditions pending, 2.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 8.2 km away
- Protected Forest Land on Both side of Panipat Khatima Road (SH-12) To Be… — forest land use approved, 8.3 km away
- Protected Forest Land FCA 1980 for non forestry purpose Proposed For Diversion… — more information requested, 8.9 km away
- Proposed Soil Mining Project located at Gata No. 52/3, 52/4मि, 52/467, 60, 62,… — under environmental review, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.