Quick answers
What is this project?
Diversion of Forest Land for the Work of 4 Lane Widening and Strengthening of Chainage 0.000 to 4.835 of Dhampur Bypass Road (Transferred Part of NH-74) is a proposed road project in Dhampur, Bijnor, Uttar Pradesh. It seeks 4.4 acres of forest land.
Who is building it?
The applicant is Executive Engineer Construcion Division 02.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Dhampur, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹28 crore and 4.4 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 21 Apr 2026.
Project details
| Official title | Diversion of Forest Land for the Work of 4 Lane Widening and Strengthening of Chainage 0.000 to 4.835 of Dhampur Bypass Road (Transferred Part of NH-74) in Bijnor District Under Moradabad Division, Uttar Pradesh State. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Nov 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construcion Division 02 |
| Forest land | 4.4 acres (1.8 ha) |
| Project cost | ₹28 crore |
| Village / locality | Dhampur |
| Taluk / tehsil | Dhampur |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07066 |
In context
22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhampur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Construction of New Road — lapsed, 2.5 km away
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — environmental approval granted, 2.6 km away
- Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in… — cleared for impact study, 2.6 km away
- Certificate of "no Increase in Pollution Load" for Addition of Alternative… — initial checks, 2.9 km away
- Proposed Soil Mining Project located at Gata No. 52/3, 52/4मि, 52/467, 60, 62,… — under environmental review, 6.9 km away
- Protected Forest Land on Both side of Panipat Khatima Road (SH-12) To Be… — forest land use approved, 7.5 km away
- Diversion of 0.9320 Hectare of Protected Forest land (FCA 1980 for non… — lapsed, 8 km away
- Protected Forest Land FCA 1980 for non forestry purpose Proposed For Diversion… — more information requested, 8 km away
More from Executive Engineer Construcion Division 02 in Bijnor
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.