Quick answers
What is this project?
Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River Betwa in Gata No.1064, Khand No-02 is an approved mining project in Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The site covers 49.9 acres.
Who is building it?
The applicant is Bhagwan Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Dec 2024), as of 27 Nov 2026.
Where is it?
In Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 49.9 acres.
When was it filed?
The application was filed on 23 Oct 2024.
Project details
| Official title | Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River Betwa in Gata No.1064, Khand No-02 at Village –Kahta-hamirpur, Tehsil- Kalpi, District- Jalaun, U. P. of M/s Laxmi Khad Bhandar, Prop: Shri Bhagwan Das Gupta |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Dec 2024 |
| Application filed | 23 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhagwan Gupta |
| Land area | 49.9 acres (20.2 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Kahta Hamirpur |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02360 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Oct 2024 (this page) | Environmental approval granted | 49.9 acres | ₹95 lakh |
| Early planning filed 12 Jan 2024 | Cleared for impact study | 49.9 acres | ₹95 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 49.9 acres, this one is larger than 64% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 79.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — cleared for impact study, 0 m away
- Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres)… — environmental approval granted, 400 m away
- Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres)… — cleared for impact study, 400 m away
- Sand/Morrum Mining Project — environmental approval granted, 700 m away
- Sand/Morrum Mining Project — cleared for impact study, 700 m away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 5.3 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 5.3 km away
- "Sand/Morrum Mining Project", Area-12.12 Ha at Gata No. 317Mi, Khand No. 05,… — under environmental review, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.