What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03

Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03 is a proposed mining project in Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The site covers 29.9 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Oct 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03 is a proposed mining project in Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The site covers 29.9 acres.

Who is building it?

The applicant is M/S Maa Vaishno Agro Industries.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Oct 2024), as of 27 Nov 2026.

Where is it?

In Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹90 lakh and a site of 29.9 acres.

When was it filed?

The application was filed on 12 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River…

Project details

Official titleRiverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03 at Village – Kahtahamirpur, Tehsil- Kalpi, District- Jalaun, U. P.
StatusCleared for impact study
Status since25 Oct 2024
Application filed12 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantM/S Maa Vaishno Agro Industries
Land area29.9 acres (12.1 ha)
Project cost₹90 lakh
Village / localityKahta Hamirpur
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01484

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Jan 2026Environmental approval granted29.9 acres₹90 lakh
Early planning filed 12 Aug 2024 (this page)Cleared for impact study29.9 acres₹90 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 29.9 acres, this one is smaller than 78% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 109.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.