Quick answers
What is this project?
Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03 is an approved mining project in Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The site covers 29.9 acres.
Who is building it?
The applicant is M/S Maa Vaishno Agro Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jun 2026), as of 27 Nov 2026.
Where is it?
In Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 29.9 acres.
When was it filed?
The application was filed on 21 Jan 2026.
Project details
| Official title | Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres) Along River Betwa in Gata No. 1064, Khand No.03 at Village – Kahtahamirpur, Tehsil- Kalpi, District- Jalaun, U. P. |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Jun 2026 |
| Application filed | 21 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Maa Vaishno Agro Industries |
| Land area | 29.9 acres (12.1 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Kahta Hamirpur |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04164 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Jan 2026 (this page) | Environmental approval granted | 29.9 acres | ₹90 lakh |
| Early planning filed 12 Aug 2024 | Cleared for impact study | 29.9 acres | ₹90 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 29.9 acres, this one is smaller than 78% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 109.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kahta Hamirpur, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres)… — cleared for impact study, 0 m away
- Sand/Morrum Mining Project — environmental approval granted, 350 m away
- Sand/Morrum Mining Project — cleared for impact study, 350 m away
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — environmental approval granted, 400 m away
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — cleared for impact study, 400 m away
- "Sand/Morrum Mine" located at Gata No. 4032/15, Village – Parasan, Tehsil-… — environmental approval granted, 5 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 5.7 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.