Cleared for impact studyMining · Chitrakoot, Uttar Pradesh

"Granite Gitti, Khanda / Boulder" Project at Gata No.- 1078 Ga Khand No.- 30, Village- Gonda, Tehsil- Karwi, District- Chitrakoot, U.P. (Applied Area : 2.0240 ha.) for M/s Vinod Kumar Mishra Mines Contractor Prop.- Shri Vinod Kumar S/o Shri Awadhesh Mishra

"Granite Gitti, Khanda / Boulder" Project at Gata No.- 1078 Ga Khand No.- 30, Village- Gonda, Tehsil- Karwi, District- Chitrakoot, U.P. (Applied Area : 2.0240 ha.) for M/s Vinod Kumar Mishra Mines Contractor Prop.- Shri Vinod Kumar S/o Shri Awadhesh Mishra is a proposed mining project in Gonda, Karwi, Chitrakoot, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹71 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 May 2025).

See it on the live map All projects in Chitrakoot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Granite Gitti, Khanda / Boulder" Project at Gata No.- 1078 Ga Khand No.- 30, Village-…

Project details

StatusCleared for impact study
Status since29 May 2025
Application filed3 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVinod Kumar
Land area5 acres (2 ha)
Project cost₹71 lakh
Village / localityGonda
Taluk / tehsilKarwi
DistrictChitrakoot
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02364

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Oct 2025Environmental approval granted5 acres₹71 lakh
Early planning filed 3 Apr 2025 (this page)Cleared for impact study5 acres₹71 lakh

In context

116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 85% of them.

10 other mining leases have applied within 500 m of this site; together with this one they cover 59.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.

Where it is

Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (7.7 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.