Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 2 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Kumar |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹1 lakh |
| Village / locality | Sambal Hera |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02395 |
In context
No other mining lease on record has applied within 5 km of this site.
Where it is
Sambal Hera, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — lapsed, 3.5 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — more information requested, 3.5 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — lapsed, 3.5 km away
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — under wildlife review, 3.5 km away
- Forest Land Proposed to be diverted for 132KV Transmission line from Jansath… — under wildlife review, 3.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — under wildlife review, 4.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — lapsed, 4.4 km away
- BSNL OFC Laying by HDD Method from Km. Ch. 59.000 to 67.800 & Km. Ch. 70.200… — lapsed, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.