Quick answers
What is this project?
17 Nos. Court and other allied buildings for Integrated Court Complex is a lapsed building project in Bishundaspur, Gauriganj, Amethi, Uttar Pradesh. The site covers 29.8 acres.
Who is building it?
The applicant is Sujeet Vishwakarma.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Bishundaspur, Gauriganj, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹461.6 crore and a site of 29.8 acres.
When was it filed?
The application was filed on 24 Feb 2024.
Project details
| Official title | Construction of 17 Nos. Court and other allied buildings for Integrated Court Complex at District – Amethi, Uttar Pradesh [Law Department, Government of Uttar Pradesh] on EPC Mode |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 24 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sujeet Vishwakarma |
| Land area | 29.8 acres (12.1 ha) |
| Project cost | ₹461.6 crore |
| Village / locality | Bishundaspur |
| Taluk / tehsil | Gauriganj |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02467 |
In context
6 applications in Amethi since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bishundaspur, Gauriganj, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 17 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 0 m away
- Residential and Non-Residential Buildings of Police Line Amethi — environmental approval granted, 4.6 km away
- Residential and Non Residential Buildings of Police Line Amethi — more information requested, 4.9 km away
- Proposed District Jail complex (990 capacity) at Amethi, Uttar Pradesh — environmental approval granted, 5.7 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.3 km away
- Protected Forest Land proposed to be diverted for the Construction of Amethi… — in-principle approval, conditions pending, 14.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 15.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.