Quick answers
What is this project?
Protected Forest Land proposed to be diverted for the Construction of Amethi Bypass (Phase-2) Project (NH-931) is a proposed road project in Tiwaripur, Amethi, Uttar Pradesh. The site covers 90.9 acres.
Who is building it?
The applicant is Ty Division NH Pwd Sultanpur.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Tiwaripur, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹225.2 crore; a site of 90.9 acres and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 21 Jul 2023.
Project details
| Official title | Protected Forest Land proposed to be diverted for the Construction of Amethi Bypass (Phase-2) Project (NH-931) in district Amethi (Uttar Pradesh). |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 5 Oct 2026 |
| Application filed | 21 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ty Division NH Pwd Sultanpur |
| Land area | 90.9 acres (36.8 ha) |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹225.2 crore |
| Village / locality | Tiwaripur |
| Taluk / tehsil | Amethi |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06641 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tiwaripur, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation & Up-gradation from design Km 0.000 to Km. 69.280 of NH-931… — more information requested, 1.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 6.9 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 7.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 9.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 10.6 km away
- Residential and Non-Residential Buildings of Police Line Amethi — environmental approval granted, 11.9 km away
- Residential and Non Residential Buildings of Police Line Amethi — more information requested, 12.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.