What is Developing? Open the mapMap

Forest land use approvedFuel stations · Amethi, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Baburi Tola, Gauriganj, Amethi, Uttar Pradesh. The site covers 0.4 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 30 Apr 2025).

See it on the live map All projects in Amethi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Baburi Tola, Gauriganj, Amethi, Uttar Pradesh. The site covers 0.4 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 30 Apr 2025), as of 27 Nov 2026.

Where is it?

In Baburi Tola, Gauriganj, Amethi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 0.4 acres and 350 m² of forest land.

When was it filed?

The application was filed on 7 Jan 2025.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Village:- Baburi Tola, Tehsil: - Gauriganj, District: - Amethi.
StatusForest land use approved
Status since30 Apr 2025
Application filed7 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area1,600 m²
Forest land350 m²
Project cost₹55 lakh
Village / localityBaburi Tola
Taluk / tehsilGauriganj
DistrictAmethi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06657

In context

6 applications in Amethi since January 2022 are in the same category (Fuel stations): 6 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baburi Tola, Gauriganj, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Amethi

3 Indian Oil Corporation (IOCL) projects in Amethi
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.