Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Baburi Tola, Gauriganj, Amethi, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Apr 2025), as of 27 Nov 2026.
Where is it?
In Baburi Tola, Gauriganj, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.4 acres and 350 m² of forest land.
When was it filed?
The application was filed on 7 Jan 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Village:- Baburi Tola, Tehsil: - Gauriganj, District: - Amethi. |
|---|---|
| Status | Forest land use approved |
| Status since | 30 Apr 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,600 m² |
| Forest land | 350 m² |
| Project cost | ₹55 lakh |
| Village / locality | Baburi Tola |
| Taluk / tehsil | Gauriganj |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06657 |
In context
6 applications in Amethi since January 2022 are in the same category (Fuel stations): 6 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baburi Tola, Gauriganj, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 1.3 km away
- Protected Forest Land proposed to be diverted for the Construction of Amethi… — in-principle approval, conditions pending, 6.9 km away
- Residential and Non-Residential Buildings of Police Line Amethi — environmental approval granted, 7.7 km away
- Rehabilitation & Up-gradation from design Km 0.000 to Km. 69.280 of NH-931… — more information requested, 7.9 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 8.3 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — lapsed, 8.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 8.4 km away
- Residential and Non Residential Buildings of Police Line Amethi — more information requested, 8.4 km away
More from Indian Oil Corporation Limited (IOCL) in Amethi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
3 Indian Oil Corporation (IOCL) projects in Amethi
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.