Quick answers
What is Bhumi Vikas Evam Grahsthan Scheme?
Bhumi Vikas Evam Grahsthan Scheme is a proposed township project in Balliya, Meerganj, Bareilly, Uttar Pradesh. The site covers 1,425.2 acres.
Who is building it?
The applicant is Executiveengineer.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Oct 2024), as of 27 Nov 2026.
Where is it?
In Balliya, Meerganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,706.5 crore and a site of 1,425.2 acres.
When was it filed?
The application was filed on 28 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bhumi Vikas Evam Grahsthan Scheme
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 28 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Executiveengineer |
| Use | Township |
| Land area | 1,425.2 acres (576.8 ha) |
| Plot area | 5,56,450 m² (59,89,572 sq ft) |
| Project cost | ₹1,706.5 crore |
| Village / locality | Balliya |
| Taluk / tehsil | Meerganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02483 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Feb 2025 | Environmental approval granted | 1,425.2 acres | ₹1,706.5 crore |
| Early planning filed 28 Sept 2024 (this page) | Cleared for impact study | 1,425.2 acres | ₹1,706.5 crore |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,425.2 acres, this one is larger than 79% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balliya, Meerganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhumi Vikas Evam Grahsthan Scheme — environmental approval granted, 0 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Green… — forest land use approved, 2.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to… — lapsed, 3.4 km away
- Protected Forest Land Proposed to be diverted for Hindustan petroleum… — lapsed, 4.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to Plot of… — lapsed, 4.6 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 4.8 km away
- Proposed Protected Forest Land to be Diverted for Construction of 02 lane rail… — under forest review, 5.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 6.1 km away