Bhumi Vikas Evam Grahsthan Scheme is an approved township project in Balliya, Meerganj, Bareilly, Uttar Pradesh. The site covers 1,425.2 acres.
Who is building it?
The applicant is Executiveengineer.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 May 2025), as of 27 Nov 2026.
Where is it?
In Balliya, Meerganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,706.5 crore and a site of 1,425.2 acres.
When was it filed?
The application was filed on 5 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 5 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executiveengineer |
| Use | Township |
| Parking spaces | 48,000 |
| Land area | 1,425.2 acres (576.8 ha) |
| Built-up area | 20,000 m² (2,15,278 sq ft) |
| Plot area | 57,67,580 m² (6,20,81,654 sq ft) |
| Project cost | ₹1,706.5 crore |
| Village / locality | Balliya |
| Taluk / tehsil | Meerganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03800 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Feb 2025 (this page) | Environmental approval granted | 1,425.2 acres | ₹1,706.5 crore |
| Early planning filed 28 Sept 2024 | Cleared for impact study | 1,425.2 acres | ₹1,706.5 crore |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,425.2 acres, this one is larger than 79% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balliya, Meerganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhumi Vikas Evam Grahsthan Scheme — cleared for impact study, 0 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Green… — forest land use approved, 2.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to… — lapsed, 3.4 km away
- Protected Forest Land Proposed to be diverted for Hindustan petroleum… — lapsed, 4.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to Plot of… — lapsed, 4.6 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 4.8 km away
- Proposed Protected Forest Land to be Diverted for Construction of 02 lane rail… — under forest review, 5.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.