Project details
| Official title | Proposed Integrated Manufacturing & Logistic Cluster (IMLC)- Shahjahanpur at Village-Gularia, Tehsil-Jalalabad, District- Shahjahanpur, Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Oct 2025 |
| Application filed | 16 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 252.1 acres (102 ha) |
| Project cost | ₹242.1 crore |
| Village / locality | Gulariya |
| Taluk / tehsil | Jalalabad |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02574 |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 252.1 acres, this one is larger than 90% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gulariya, Jalalabad, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 2.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 5.8 km away
- Proposed Protected Forest Land to be diverted for Widening and Strengthening… — more information requested, 8.4 km away
- Protected Forest Land is Proposed to be diverted for Entry/Exit approach to… — under forest review, 9.3 km away
- Proposed protected forest land to be diverted for Entry & Exit approach to… — forest land use approved, 11.8 km away
- ProposedProtected Forest Land to be diverted for Laying of Gas Pipe Line along… — in-principle approval, conditions pending, 14.3 km away
- PROPOSED INTEGRATED WEAK NITRIC ACID (WNA) AND AMMONIUM NITRATE (AN)… — environmental approval granted, 16 km away
- PROPOSED INTEGRATED WEAK NITRIC ACID (WNA) AND AMMONIUM NITRATE (AN)… — cleared for impact study, 16 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.