Project details
| Status | Under forest review |
|---|---|
| Status since | 5 Oct 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,600 m² |
| Forest land | 2,270 m² |
| Project cost | ₹65 lakh |
| Village / locality | Thingri |
| Taluk / tehsil | Jalalabad |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06888 |
In context
23 applications in Shahjahanpur since January 2022 are in the same category (Fuel stations): 10 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.9 acres, this one is smaller than 57% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thingri, Jalalabad, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry & Exit approach to… — forest land use approved, 3.7 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC)- Shahjahanpur — cleared for impact study, 9.3 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — forest land use approved, 10.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 11.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 14.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 16 km away
- Proposed Protected Forest Land to be diverted for Widening and Strengthening… — more information requested, 17.2 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — lapsed, 18.5 km away
More from Indian Oil Corporation Limited (IOCL) in Shahjahanpur
- Protected Forest Land Proposed to be diverted for Entry / Exit Approach to… — in-principle approval, conditions pending
- Protected Forest Land Proposed to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending
8 Indian Oil Corporation (IOCL) projects in Shahjahanpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.