Quick answers
What is this project?
Environmental clearance for "Maharashtra Bhawan (Bhakt Niwas)" at Plot No. 8A/MSIB-02 by Govt of Maharashtra is an approved commercial project in Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh. It plans 110 units in 2 towers of up to 13 floors on 6.2 acres.
Who is building it?
The applicant is Office of Executive Engineer, Presidency (P.W.) Division, Mumbai - Government of Maharashtra, Public works Department (PWD).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Nov 2025), as of 27 Nov 2026.
Where is it?
In Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹194.3 crore and a site of 6.2 acres.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Official title | Environmental clearance for "Maharashtra Bhawan (Bhakt Niwas)" at Plot No. 8A/MSIB-02, under "UPAVP scheme- Bhoomi Vikas Grihsthan Evam Bazar Yojna (Greenfield Township)" in Ayodhya, U.P., developed by Govt of Maharashtra. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Nov 2025 |
| Application filed | 3 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Office of Executive Engineer, Presidency (P.W.) Division, Mumbai - Government of Maharashtra, Public works Department (PWD) |
| Use | Commercial |
| Units | 110 |
| Towers | 2 |
| Floors (tallest) | 13 |
| Basements | 1 |
| Parking spaces | 567 |
| Land area | 6.2 acres (2.5 ha) |
| Built-up area | 32,860 m² (3,53,702 sq ft) |
| Plot area | 9,421 m² (1,01,407 sq ft) |
| Project cost | ₹194.3 crore |
| Village / locality | Shah Newazipur Manjha |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02753 |
In context
15 applications in Ayodhya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.2 acres, this one is smaller than 67% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lemon Tree Premier Hotel — under environmental review, 200 m away
- Lemon Tree Premier Hotel — withdrawn, 200 m away
- Plotting & Development of Greenfield Township Yojna — environmental approval granted, 1.1 km away
- Proposed Bus Terminal Commercial Complex (Be Together Center Point Ayodhya) at… — under environmental review, 1.9 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — more information requested, 2.7 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 2.7 km away
- "Manjha Barhata Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — under environmental review, 2.7 km away
- "Manjha Barhata Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — cleared for impact study, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.