Quick answers
What is this project?
Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Sambhal at Villages - Khirni Mohiuddinpur, Basla, Bahadarpur Saray Urf Rampur, Ajhra, Amawati Kutabpur and Sarangpur, Tehsil - Sadar Sambhal, District - Sambhal, State- Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) is a proposed industrial project in Amauti Kutbpur, Sambhal, Uttar Pradesh. The site covers 590.8 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Oct 2025), as of 27 Nov 2026.
Where is it?
In Amauti Kutbpur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹663.1 crore and a site of 590.8 acres.
When was it filed?
The application was filed on 19 Sept 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Oct 2025 |
| Application filed | 19 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 590.8 acres (239.1 ha) |
| Project cost | ₹663.1 crore |
| Village / locality | Amauti Kutbpur |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02778 |
In context
10 applications in Sambhal since January 2022 are in the same category (Industry): 7 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 590.8 acres, this one is larger than 80% of them.
Where it is
Amauti Kutbpur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining Project" at Gata 62, 79, 80, 87, 98, 263, 99,… — environmental approval granted, 5.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 7.8 km away
- Proposed Protected Forest Land to be diverted for Ex-post Facto Approval… — more information requested, 8 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 8 km away
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — forest land use approved, 8.2 km away
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — lapsed, 8.2 km away
- Retail Outlet MS/HSD Petrol/Diesel Pump BPCL Ltd. Bareilly. Protected land is… — forest land use approved, 8.3 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.