Quick answers
What is this project?
M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For Non forestry Purposed ) MS/HSD (Retail Outlet) Site is an approved fuel station in Turtipur Elha, Sambhal, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Dec 2025), as of 27 Nov 2026.
Where is it?
In Turtipur Elha, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.4 acres and 520 m² of forest land.
When was it filed?
The application was filed on 24 Aug 2025.
Project details
| Official title | Construction OF M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For Non forestry Purposed ) MS/HSD (Retail Outlet) Site situated at Village Turtipur elha Khasra/Gata No-347,348KA,343,344, On Badaun-Bilsi-Bijnor Road (S.H.-51) Road Km. 91 Chainage 90.9537 to 90.9887 (LHS) Tehsil & District Sambhal (Uttar Pradesh). |
|---|---|
| Status | Forest land use approved |
| Status since | 15 Dec 2025 |
| Application filed | 24 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,700 m² |
| Forest land | 520 m² |
| Project cost | ₹60 lakh |
| Village / locality | Turtipur Elha |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05800 |
In context
26 applications in Sambhal since January 2022 are in the same category (Fuel stations): 15 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.4 acres, this one is smaller than 96% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Turtipur Elha, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — lapsed, 0 m away
- Proposed Protected Forest Land to be diverted for Ex-post Facto Approval… — more information requested, 600 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 2.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 3.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.8 km away
- Retail Outlet MS/HSD Petrol/Diesel Pump BPCL Ltd. Bareilly. Protected land is… — forest land use approved, 5.5 km away
- Protected Forest Land Proposed For Diversion For (FCA 1980 Non forestry… — lapsed, 5.7 km away
- Ordinary Earth Mining Project" Gata No. 221, 354, 418, 431, 432, 433 Village-… — environmental approval granted, 7.3 km away
More from Indian Oil Corporation Limited (IOCL) in Sambhal
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — lapsed
7 Indian Oil Corporation (IOCL) projects in Sambhal
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.