Quick answers
What is this project?
Pailani Barrage Project Under Ken - Betwa Link Pariyojana , Tehsil Pailani, District Banda is a withdrawn water and irrigation project in Chandpurwa Khurd, Hamirpur, Uttar Pradesh. The site covers 1,08,132.8 acres.
Who is building it?
The applicant is Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba.
Has it been approved?
No. The application was withdrawn on 5 Jun 2025, so it is no longer under consideration.
Where is it?
In Chandpurwa Khurd, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2,480.6 crore and a site of 1,08,132.8 acres.
When was it filed?
The application was filed on 5 Jun 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 5 Jun 2025 |
| Application filed | 5 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Ken Betwa Link Canal Construction Division -1 Mahoba |
| Land area | 1,08,132.8 acres (43,759.9 ha) |
| Project cost | ₹2,480.6 crore |
| Village / locality | Chandpurwa Khurd |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02780 |
Where it is
Chandpurwa Khurd, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining from Riverbed of Ken River, Village- Bhulsi,… — environmental approval granted, 15.4 km away
- Riverbed Sand/Morrum Mining from Riverbed of Ken River, Village- Bhulsi,… — cleared for impact study, 15.4 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 16.3 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 16.3 km away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — initial checks, 17.8 km away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — cleared for impact study, 17.8 km away
- "Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3,… — environmental approval granted, 18.9 km away
- "Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3,… — cleared for impact study, 18.9 km away
All 4 Executive Engineer Ken, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.