What is Developing? Open the mapMap

Cleared for impact studyMining · Hamirpur, Uttar Pradesh

Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 63/1, 64/1, Khand No. 23/12 Area- 12.145 ha (30.0Acre), Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Shubh Construction and Suppliers, Prop. Shri Arvind Singh.

Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 63/1, 64/1, Khand No. 23/12 Area- 12.145 ha (30.0Acre), Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Shubh Construction and Suppliers, Prop. Shri Arvind Singh is a proposed mining project in Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres. Its stated project cost is ₹38 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Dec 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 63/1, 64/1, Khand No. 23/12 Area- 12.145 ha (30.0Acre), Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Shubh Construction and Suppliers, Prop. Shri Arvind Singh is a proposed mining project in Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres.

Who is building it?

The applicant is Arvind Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 19 Dec 2025), as of 27 Nov 2026.

Where is it?

In Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹38 lakh and a site of 30 acres.

When was it filed?

The application was filed on 8 Sept 2025.

Project details

StatusCleared for impact study
Status since19 Dec 2025
Application filed8 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantArvind Singh
Land area30 acres (12.2 ha)
Project cost₹38 lakh
Village / localityBhedi Dariya
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02789

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 60 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.