What is Developing? Open the mapMap

Environmental approval grantedMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is an approved mining project in Bhedi Danda, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Feb 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is an approved mining project in Bhedi Danda, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres.

Who is building it?

The applicant is sHAiLENDRA KUMAR.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Bhedi Danda, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 30 acres.

When was it filed?

The application was filed on 11 Oct 2025.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Bhedi Kharka, Khand No.- 23/13, Lease Area- 12.145 Ha. (30 Acres), Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- Shri Shailendra Kumar
StatusEnvironmental approval granted
Status since9 Feb 2026
Application filed11 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantsHAiLENDRA KUMAR
Land area30 acres (12.2 ha)
Project cost₹80 lakh
Village / localityBhedi Danda
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03177

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Oct 2025 (this page)Environmental approval granted30 acres₹80 lakh
Early planning filed 19 Nov 2024Cleared for impact study30 acres₹80 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 114.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Bhedi Danda, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from sHAiLENDRA KUMAR in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.