Quick answers
What is this project?
Proposed expansion of existing distillery unit from 250 KLD to 300 KLD on C Heavy Molasses based operation without increase in pollution load is a proposed industrial building project in Asmouli, Sambhal, Uttar Pradesh. The site covers 106.6 acres.
Who is building it?
The applicant is Dhampur Bio Organics Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Asmouli, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹229.5 crore and a site of 106.6 acres.
When was it filed?
The application was filed on 24 Oct 2025.
Project details
| Official title | Proposed expansion of existing distillery unit from 250 KLD to 300 KLD on C Heavy Molasses based operation without increase in pollution load at village – Asmoli, Tehsil – Sambhal, Distt – Sambhal (Up) – 244304 by M/s Dhampur Bio Organics Limited, Unit – Asmoli, Division – Biofuels & Spirits |
|---|---|
| Status | Initial checks |
| Status since | 24 Oct 2025 |
| Application filed | 24 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dhampur Bio Organics Limited |
| Use | Industrial |
| Land area | 106.6 acres (43.1 ha) |
| Project cost | ₹229.5 crore |
| Village / locality | Asmouli |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02797 |
In context
6 applications in Sambhal since January 2022 are in the same category (Buildings & townships): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asmouli, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 100 m away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — cleared for impact study, 100 m away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 100 m away
- "Ordinary Soil Mining" Project at Gata No.- 291कमि, 293, 318, 336, 337, 338,… — environmental approval granted, 2 km away
- "Ordinary Soil Excavation Mining Project" at Gata No. 293, 342 Mining Lease… — environmental approval granted, 2.1 km away
- "Ordinary Soil Mining" Project at Gata No.- 263, 283, 285, 284, 295, Village-… — under environmental review, 2.2 km away
- "Ordinary Soil Mining" Project at Ga ta No.- 1232, 1293, Village-Bela, Tehsil-… — initial checks, 2.6 km away
- Ordinary Soil Excavation Project — environmental approval granted, 3.9 km away
More from Dhampur Bio Organics Limited in Sambhal
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — cleared for impact study
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted
4 Dhampur Bio Organics projects in Sambhal
All 7 Dhampur Bio Organics projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.