Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 291कमि, 293, 318, 336, 337, 338, 343, 371, 376, Village- Hirapur, Tehsil- Sambhal, District- Sambhal, U.P. (Area – 3.5600 ha). Shri Peeyush is an approved mining project in Hirapur, Sambhal, Uttar Pradesh. The site covers 8.8 acres.
Who is building it?
The applicant is Peeyush.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Feb 2026), as of 27 Nov 2026.
Where is it?
In Hirapur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹28 lakh and a site of 8.8 acres.
When was it filed?
The application was filed on 16 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Feb 2026 |
| Application filed | 16 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Peeyush |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹28 lakh |
| Village / locality | Hirapur |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03326 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.8 acres, this one is larger than 78% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 16.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Hirapur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Mining Project" at Gata No. 293, 342 Mining Lease… — environmental approval granted, 100 m away
- "Ordinary Soil Mining" Project at Gata No.- 263, 283, 285, 284, 295, Village-… — under environmental review, 350 m away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 1.9 km away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — cleared for impact study, 1.9 km away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 1.9 km away
- Proposed expansion of existing distillery unit from 250 KLD to 300 KLD on C… — initial checks, 2 km away
- "Ordinary Soil Mining" Project at Ga ta No.- 1232, 1293, Village-Bela, Tehsil-… — initial checks, 3.1 km away
- Ordinary Soil Excavation Project — environmental approval granted, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.