Environmental approval grantedMining · Kanpur Nagar, Uttar Pradesh

"Morrum Mining" from Riverbed of Yamuna River

"Morrum Mining" from Riverbed of Yamuna River is an approved mining project in Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 68 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Sept 2026).

See it on the live map All projects in Kanpur Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Morrum Mining" from Riverbed of Yamuna River?

"Morrum Mining" from Riverbed of Yamuna River is an approved mining project in Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 68 acres.

Who is building it?

The applicant is Anita Sharma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Sept 2026), as of 27 Nov 2026.

Where is it?

In Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 68 acres.

When was it filed?

The application was filed on 14 May 2026.

Project details

Official title"Morrum Mining" from Riverbed of Yamuna River at Village- Samuhi, Gata No.- 1598 Ch, Lease Area- 27.50 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s A. R. Construction (Prop. - Anita Sharma)
StatusEnvironmental approval granted
Status since28 Sept 2026
Application filed14 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAnita Sharma
Land area68 acres (27.5 ha)
Project cost₹1.5 crore
Village / localitySamuhi
Taluk / tehsilGhatampur
DistrictKanpur Nagar
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05026

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 May 2026 (this page)Environmental approval granted68 acres₹1.5 crore
Early planning filed 16 Sept 2025Cleared for impact study68 acres₹1.5 crore

In context

10 applications in Kanpur Nagar since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 68 acres, this one is larger than 80% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Samuhi, Ghatampur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.