What is Developing? Open the mapMap

More information requestedMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Yamuna River

"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Harshankarpur Diwara, Jalaun, Uttar Pradesh. The site covers 22.2 acres. Its stated project cost is ₹3.7 crore. As of 27 Nov 2026, its status is “More information requested” (since 1 Sept 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Yamuna River?

"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Harshankarpur Diwara, Jalaun, Uttar Pradesh. The site covers 22.2 acres.

Who is building it?

The applicant is Varsha Prajapati.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Harshankarpur Diwara, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.7 crore and a site of 22.2 acres.

When was it filed?

The application was filed on 17 Apr 2025.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Yamuna River at Village-Harshankarpur Diwara, Gata No.- 76मि, Khand No.-01, Lease Area- 9.00 Ha., Tehsil– Jalaun, District– Jalaun, Uttar Pradesh, Project Proponent- M/s Aadhya Traders (Prop. – Smt. Varsha Prajapati)
StatusMore information requested
Status since1 Sept 2026
Application filed17 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVarsha Prajapati
Land area22.2 acres (9 ha)
Project cost₹3.7 crore
Village / localityHarshankarpur Diwara
Taluk / tehsilJalaun
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02930

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.2 acres, this one is smaller than 86% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 44.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Harshankarpur Diwara, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.