"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Harshankarpur Diwara, Jalaun, Uttar Pradesh. The site covers 22.2 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 12 Nov 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Yamuna River?

"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Harshankarpur Diwara, Jalaun, Uttar Pradesh. The site covers 22.2 acres.

Who is building it?

The applicant is Puneet Gupta.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Harshankarpur Diwara, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.3 crore and a site of 22.2 acres.

When was it filed?

The application was filed on 8 Oct 2026.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Yamuna River at Village-Harshankarpur Diwara, Gata No.- 76Mi, Khand No.-02, Lease Area- 9.00 Ha., Tehsil– Jalaun, District– Jalaun, Uttar Pradesh, Project Proponent- Shri Puneet Gupta S/o Shri Ramesh Chandra Gupta
StatusUnder environmental review
Status since12 Nov 2026
Application filed8 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPuneet Gupta
Land area22.2 acres (9 ha)
Project cost₹1.3 crore
Village / localityHarshankarpur Diwara
Taluk / tehsilJalaun
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04401

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Oct 2026 (this page)Under environmental review22.2 acres₹1.3 crore
Early planning filed 17 Sept 2025Under environmental review22.2 acres₹1.3 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.2 acres, this one is smaller than 86% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 44.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Harshankarpur Diwara, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.