Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Harshankarpur Diwara, Jalaun, Uttar Pradesh. The site covers 22.2 acres.
Who is building it?
The applicant is Puneet Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Harshankarpur Diwara, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 17 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village-Harshankarpur Diwara, Gata No.- 76Mi, Khand No.-02, Lease Area- 9.00 Ha., Tehsil– Jalaun, District– Jalaun, Uttar Pradesh, Project Proponent- Shri Puneet Gupta S/o Shri Ramesh Chandra Gupta |
|---|---|
| Status | Under environmental review |
| Status since | 21 Jul 2026 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Puneet Gupta |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Harshankarpur Diwara |
| Taluk / tehsil | Jalaun |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03348 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2026 | Under environmental review | 22.2 acres | ₹1.3 crore |
| Early planning filed 17 Sept 2025 (this page) | Under environmental review | 22.2 acres | ₹1.3 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.2 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 44.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Harshankarpur Diwara, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 0 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — more information requested, 400 m away
- Gajraura Sand/Morrum Mine — environmental approval granted, 950 m away
- Gajraura Sand/Morrum Mine — cleared for impact study, 950 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 8.9 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — environmental approval granted, 9.1 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 9.1 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 9.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.