Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is an approved mining project in Bindhauli, Orai, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Shri Anand Kumar Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jun 2026), as of 27 Nov 2026.
Where is it?
In Bindhauli, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 50 acres.
When was it filed?
The application was filed on 1 Jan 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Bandhuli, Gata No.- 2559, 2563, Khand No.- 01, Lease Area- 20.242 Ha., Tehsil- Orai, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Anandeshwar Chemtech Pvt. Ltd. (Director- Shri Anand Kumar Gupta) |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Jun 2026 |
| Application filed | 1 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Anand Kumar Gupta |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Bindhauli |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04456 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Jan 2026 (this page) | Environmental approval granted | 50 acres | ₹1.6 crore |
| Early planning filed 17 Apr 2025 | Cleared for impact study | 50 acres | ₹1.6 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 100 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Bindhauli, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 350 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 350 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 800 m away
- Sand/Morrum Mine — environmental approval granted, 1 km away
- Sand/Morrum Mine — cleared for impact study, 1 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 1.1 km away
- "Sand/Morrum Mining at Betwa River Bed" at Gata No. 2558, 2563 (Khand -05) of… — environmental approval granted, 1.2 km away
More from Shri Anand Kumar Gupta in Jalaun
- Riverbed Sand/Morrum Mining Project having lease area 16.1877 ha (40.00 acre)… — environmental approval granted
- Riverbed Sand/Morrum Mining Project having lease area 16.1877 ha (40.00 acre)… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.