Quick answers
What is "Ordinary Earth Mining Project"?
"Ordinary Earth Mining Project" is an approved mining project in Kusahri, Hasanganj, Unnao, Uttar Pradesh. The site covers 6 acres.
Who is building it?
The applicant is Mohammad Mumtaz.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Apr 2025), as of 27 Nov 2026.
Where is it?
In Kusahri, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹15 lakh and a site of 6 acres.
When was it filed?
The application was filed on 1 Jan 2025.
Project details
| Official title | "Ordinary Earth Mining Project" at Gata No.- 736 Village: Kushahari, Tehsil: Hasanganj, District- Unnao, Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Apr 2025 |
| Application filed | 1 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mohammad Mumtaz |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Kusahri |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02967 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Kusahri, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 1.7 km away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 1.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 1.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 1.7 km away
- Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 2 km away
- "Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village-… — environmental approval granted, 2.7 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 3.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.